Single-Minute Exchange of Dies (SMED)
SMED is a lean manufacturing process that aims to reduce the time it takes to complete equipment changeovers. The goal is to minimize downtime associated with setting up new production runs, thereby increasing operational efficiency and flexibility. By streamlining changeover procedures, SMED helps facilities respond more quickly to customer demands and improve productivity.
Our 30-day, risk free trial is only $199.
AssetWatch customers save on average 8x in ROI. That means for every $1 you give us, we give $8 back to you.
Includes professional installation of up to 200 sensors (a $10k+ value)
24/7 monitoring and a dedicated CME for your site
AssetWatch cloud-based software with unlimited licenses
No CapEx, Engineering or IT integration required